Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 30 results ...

Abdelaty, A F A (2017) Data-driven algorithms for enhanced transportation infrastructure asset management, Unpublished PhD Thesis, , Iowa State University.

Al Shalabi, F A (2016) BIM framework for energy and maintenance performance assessment for facility management, Unpublished PhD Thesis, , Iowa State University.

AlBughdadi, A J M (2022) Advanced decision support tools for bridge asset management, Unpublished PhD Thesis, , Iowa State University.

Azmy, N (2012) The role of team effectiveness in construction project teams and project performance, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Barbosa Resende, C (2021) Post-construction evaluation for work zones and construction engineers' training, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Barutha, P J (2018) Integrated project delivery for industrial projects, Unpublished PhD Thesis, , Iowa State University.

Canales Fernandez, A R (2004) Developing effective integration between American supervisors and hispanic craft workers in construction, Unpublished PhD Thesis, , Iowa State University.

Christensen, A N (2019) Identifying private construction project owner inefficiencies that affect project goals, Unpublished PhD Thesis, , Iowa State University.

El-adaway, I H (2008) Construction dispute mitigation through multi-agent based simulation and risk management modeling, Unpublished PhD Thesis, , Iowa State University.

Elmisalami, T E (2001) Developing a multi-attribute utility model (MAUM) for selecting information technologies in the construction industry, Unpublished PhD Thesis, , Iowa State University.

Enz, D L (2009) Construction project administration and management for mitigating work zone crashes and fatalities: An integrated risk management model, Unpublished PhD Thesis, , Iowa State University.

Gad, G M (2012) Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts, Unpublished PhD Thesis, , Iowa State University.

Gao, Z (2004) Investigation of technologies to improve the visualization of design documents and construction process, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Harmelink, D J (1995) Linear scheduling model: The development of a linear scheduling model with microcomputer applications for highway construction project control, Unpublished PhD Thesis, , Iowa State University.

Kaewmoracharoen, M (2009) Feasibility of visualization and simulation applications to improve work zone safety and mobility, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Kawal, D E (1970) A systems model of a construction firm, Unpublished PhD Thesis, , Iowa State University.

Lueth, P L O (2008) The architectural design studio as a learning environment: A qualitative exploration of architecture design student learning experiences in design studios from first- through fourth-year, Unpublished PhD Thesis, , Iowa State University.

Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML), Unpublished PhD Thesis, , Iowa State University.

McCann, M (1986) An application of convex programming to construction scheduling, Unpublished PhD Thesis, Industrial and Manufacturing Systems Engineering, Iowa State University.

Mohd Zainudin, N (2019) Identification and analysis of worker safety hazards in Midwest agribusiness construction work sites, Unpublished PhD Thesis, Agricultural and Biosystems Engineering, Iowa State University.

Nahvi, A (2019) Integrated stochastic economics performance evaluation of horizontal infrastructure systems, Unpublished PhD Thesis, , Iowa State University.

Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods, Unpublished PhD Thesis, , Iowa State University.

Rahbar, F (1997) Computer-aided parametric planning (CAPP), Unpublished PhD Thesis, , Iowa State University.

Rueda-Benavides, J A (2016) Indefinite delivery/indefinite quantity project selection framework using stochastic techniques, Unpublished PhD Thesis, , Iowa State University.

Shrestha, K P (2016) Data analytics and visualization for enhanced highway construction cost indexes and as-built schedules, Unpublished PhD Thesis, , Iowa State University.

  • Type: Thesis
  • Keywords: construction cost; health care; highway; budgeting; decision making; investment; project control; visualization; cost index
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/1845046362
  • Abstract:
    A considerable amount of digital data is being collected by State Highway Agencies (SHAs) to aid project-planning activities, support various project level decision-making processes, and effectively maintain and operate constructed highway assets. However, the highway construction industry has been significantly lagging behind utilizing the growing digital data to support business decisions compared to other industry sectors such as health care and energy. The significant lack of understanding on the linkage between raw data collected and various decisions, proper computational methodologies, and effective guidance is considered as major barriers to the full utilization of the digital data. This study uses digital datasets that are now commonly available in SHAs, to demonstrate the smart utilization of existing digital data to support and enhance decision-making processes using data analytics and visualization methods. This study will a) develop an advanced computational methodology to generate multidimensional highway construction cost indexes (HCCIs) using two new concepts of i) dynamic item basket and ii) multidimensional HCCI, b) develop an enhanced framework for collection and utilization of digital Daily work Report (DWR) data, c) develop an automated methodology to generate as-built schedules using data collected from existing DWR systems, and d) analyze as-built schedules to develop a knowledge base of frequent precedence relationships of activities. The study achieves those objectives by utilizing three digital datasets: bid data, DWR data, and project characteristics data. Further, two standalone prototype systems, namely, Dyna-Mu-HCCI and ABSS are developed to automate computational methodologies for multidimensional HCCI calculation and as-built schedule development respectively. This study will aid SHAs to utilize currently unused datasets for informed budgeting and project control decisions. It demonstrates the importance of data analytics and visualization to obtain more value from the investment made in collecting construction data. Overall, this study serves as a step in making a transition from experience driven to data driven decision making in the construction industry.

Sirotiak, T L (2008) The effect of problem/project-based learning on a desired skill set for construction professionals, Unpublished PhD Thesis, , Iowa State University.

Smadi, O G (2000) Knowledge-based expert system pavement management optimization, Unpublished PhD Thesis, , Iowa State University.

Talbot, J (2021) Understanding housing reconstruction in Puerto Rico after hurricanes Irma and Maria, Unpublished PhD Thesis, , Iowa State University.

Tapia, R M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Woldesenbet, A (2014) Highway infrastructure data and information integration & assessment framework: a data-driven decision-making approach, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.